Thursday, 14 April 2016

Anchor windlass

After removing the gipsy from the anchor windlass I had put it on one side but further investigation showed that the clutch cone was jammed into the gipsy and had not been moved even when I removed the gipsy with wedges the clutch being a press fit on the shaft. After tapping all round the back of the cone it came out quite easily now the cone is made of tufnol or similar but it seems to have an attraction for rust which was stuck to it. Also I discovered that the clutch cone is pinned to the shaft with a roll pin which had sheared off, one reason may have been that the pin had not been driven right through the shaft which meant that only half of it was driving which may have contributed to it shearing off. The roll pins are quarter inch by two inches long which I sourced from Amazon they arrived today so that will be the weekends homework putting it all back together. I feel a bit guilty about using Amazon especially after their antics over tax in this country however if you go in to the Amazon site via the RNLI site they get a donation reduces the guilt feeling a bit although the donation from the purchase of a packet of roll pins would be fairly insignificant.




Sheared roll pin




Gipsy and clutch cone

The rest of the week has been spent mostly sanding and varnishing locker lids gradually working through them takes a bit of time to get three coats of varnish on both sides of each one.

The yard crane is booked for Monday next week to lift the engine in so there will be another post once that has been done. 



Tuesday, 5 April 2016

Homework

The weather over the weekend was ideal for getting a coat or two of paint on the engine gave it a good wash down with No Nonsense heavy duty de-greaser from Screwfix I find this stuff to be effective and a reasonable price. I used it to clean out the well under the engine when replacing the engine on the Bowman it was a real mess down there old grease from the stern tube, old engine oil amongst other things put on neat with a brush then rinse off with water. Found dark green spray can of smooth Hammerite in the workshop so that settled the colour choice I needed another to finish the job the engine had previously been painted in Hammerite yes I know the air filter needs painting its just there to prevent anything falling in for the moment.




Resplendent in dark green with new flexible mounts 


The ancillary bits and pieces, starter, alternator, coolers etc, still have to be fitted but the plan is to do this after the engine has been lined up with the propeller shaft it leaves a bit more space and reduces the weight considerably. Tomorrow I will see if I can organise the yard crane to lift the engine in.

Today I turned my attention to the Simpson Lawrence anchor windlass the chain gipsy was very tight on its shaft probably too tight to allow the anchoer to drop under its own weight. I had tried pumping grease in to no avail. I had previously had a half hearted attempt to remove it but the bolt holding the chain stripper was seized in the aluminium casting and sheared off when I tried to remove it and the stainless steel stripper was also seized so it was time to bite the bullet and hacksaw through the stripper I shall make a new one later its only half inch stainless bar. To remove the gipsy required a hammer and wedges  and once off the reason for the stiffness was obvious the grease was not getting to the shaft the grease outlet was solid with congealed grease which required drilling out. I removed the cover to inspect gears and everything appears to be in good order with plenty of grease so after a bit of fettling and painting the windlass will be fit for further service. 





Windlass shaft after removing the gipsy 


The rest of the week will probably be spent on sanding and varnishing the internal locker lids there are rather a lot about 20 I think








Friday, 1 April 2016

Best laid plans and the first scent of spring

The intention had been to spray paint the engine last weekend and lift it into place today while the yard crane was loading a boat onto transport however the weather was not conducive to spraying paint outside, wind and rain, this has been put off until this coming weekend. Instead on Monday I built up around the openings for the sea cocks with thickened epoxy as the mastic that had been used previously did not seem to have compatible with the gelcoat which had crazed somewhat. While the epoxy was curing I fitted the 'P' bracket permanently with plenty of Sikaflex then nipped up the bolts until the Sikaflex started to squeeze out which I used to fair off round the bracket then left it to cure. To finish off the day I pulled the newly washed topping lift back into the mast and took out the main halyard for washing.

On Wednesday I sanded the epoxy round the sea cock openings and cut the skin fittings to the correct length as fitting the sea cocks is a two handed job I had to leave any further work on them for the time being.




Opening for sea cock after building up and sanding back

I tightened the 'P' bracket bolts and fitted the propeller shaft and stern tube the stern tube bolts directly to the inside of the hull and was originally bedded on what looked like an epoxy putty some of which was missing so I built up with thickened epoxy and some GRP flat bar unfortunately I now have an alignment problem with the stern tube I am going to leave it until the engine is in and lined up then I will re-bed the stern tube as original. The Sikaflex needs cleaning up around the 'P' bracket



  
'P' bracket in place

To finish off I pulled the newly washed main halyard back into the mast just the genoa furling line and signal halyards to do, the genoa furling gear is a Sailspar continuous line system not sure how to get the line out without cutting it yet cutting and re-splicing used braid on braid is difficult if not impossible the best way is to perhaps wash it while it is still in place.

Today a friend turned up in the yard and so the opportunity was taken to fit four of the sea cocks the two for the cockpit drains, the galley waste and the heads water intake the engine intake will have to wait until the cockpit drains are permanently connected, the current temporary arrangement utilises the engine intake opening, and the heads discharge I have a bit of a problem with fitting a 1.5" Marelon sea cock as it will foul the inner moulding in the heads I think it is possible to get a Marelon unit with a 90 degree hose tail but this may not be ideal for the heads discharge the risk of blockage in this area needs to be kept to an absolute minimum I may have to bite the bullet and shell out for one of those expensive Blake's units.




Marelon sea cock




Starboard cockpit drain sea cock in place




Heads intake sea cock in place




Outside view showing skin fitting


And so to the first scent of spring no not spring flowers but the smell of new varnish I have been cleaning up some of the internal locker lids some of these unfortunately had been affected by the rain water leaking in however I had washed them with a bleach solution to get rid of the black mould and gave them a sanding and with todays fine warmish weather I took the opportunity to get some varnish on some of them.




The first scent of spring




Wednesday, 23 March 2016

Sea cocks and engine mounts

With a bit of a temperature rise on Monday I decided to epoxy in the new ply backing pads for the galley waste and cockpit drain sea cocks I had cut them out some time ago but the weather had been too cold for epoxy. I drilled a hole in the centre using the hole saw pilot drill and epoxied them in place with a nut and bolt and a piece of scrap ply to hold them in place until the epoxy had cured.



Backing pad held in place

This morning I removed the bolts and put the hole saw through to open up the hole in the pad working from both sides to reduce the risk of splintering as the hole saw broke through.



Hole cut out

Just need to give them a coat of epoxy then I can fit the sea cocks decided to go with Marelon plastic its a carbon reinforced nylon.
After a bit of searching around Ifound some flexible engine mounts that will fit I calculated that there was 40mm between the engine feet and the bearers I found that the mounts that Parts 4 Engines sell for the Perkins 4-108 are only 38.5mm high without the height adjusting stud so a quick e-mail to the firm to confirm that they can be installed by bolting them directly to the engine feet and then any height adjustment can be carried out with shims under the mount. Tony Robins at Parts 4 Engines is very helpful and prompt with replies to queries. The next problem is the original mounts had bolts on 5.5" centres and the new ones are on 4" centres the plan is to recess some 50mm x 10mm steel into the top face of the engine bearers and then drill and tap at 4" centres and bolt the new mounts down with 10mm set bolts.



Original position of engine mount

The two aft mounts are secured by coach screws directly into the timber engine bearers this method will be reused to secure the steel plates the forward mounts are secured with nuts and bolts as there is sufficient depth in the bearer to allow a slot through the bearer so as to be able to fit nuts and bolts.



Recess cut out for mounting plate


Mounting plate in place

The mounting plates will be drilled and tapped once the engine has been put in place and lined up




Friday, 18 March 2016

Prop Shaft

I had a dry run with the prop shaft and 'P' bracket today as I need to replace the engine mounts and I was unsure of the amount of space that I had. The engine has a 1:1 gearbox which means that the output shaft is on the crankshaft centre line there is not a lot of space between the engine feet and the bearers, the original Perkins mounts were recessed into the bearers and unfortunately as far as I can see are obsolete so it looks as though I shall have to use whatever is available and modify the bearers to suite


Shaft and 'P' bracket in place


Set up for measuring shaft height above engine bearers


Shaft in place

I turned up a sleeve to hold the shaft centrally in the stern tube, the black object in the picture I left the square in order to be able to remove it, so as to get the shaft in its correct position.
After that I Tied up a few loose ends by fitting the last handrail stanchion base which I now have courtesy of the previous owner also fitted the missing spinnaker sheet block which came with the stanchion base.
Finally pulled in the new genoa halyard which went without a hitch always a relief when it emerges still attached to the mousing line.  With the mousing line free I removed the spinnaker halyard which will go into the wash tomorrow. The plan is to work through the running rigging and clean it all up and then replace as necessary I think most of it is ok its amazing what a good wash will do.


Genoa halyard emerges from the mast.



Monday, 7 March 2016

Running Riging

A job that has been bugging me for a while was the genoa halyard which had been removed from the mast without leaving a mousing line so while the mast is down decided to give it a go on Friday the first attempt was with a spring steel mouse but couldn't get it much more than a metre or two down the mast from whichever way it was entered. The mast is the original Proctor job with a welded head fitting so no chance of removing it and trying from the top a case of back to the drawing board for a plan B. Plan B was to use another halyard to pull a mousing line through the mast and the favourite was the topping lift as the masthead sheave is directly opposite the genoa halyard sheave so the eye end of the topping lift was pulled up to the masthead and secured and I found that by pulling the other end tight I could see the topping lift through the genoa halyard exit only needed a bit of bent wire to hook it out see photograph. This photograph was staged today as I had not got the camera on Friday the already inserted mousing line can be seen.


Topping lift with mousing line attached

I was then only a matter of attaching the end of the mousing line to the topping lift with some sticky tape and carefully pulling on the eye end of the topping lift until the mousing line appeared at the masthead sheave then I passed a long hook through the mast from the genoa halyard sheave and pulled the mousing line through and the job was done only took about five minutes.


Masthead topping lift is on the left

The original halyard was a combined wire and three strand rope so I decided to replace it with a new braid on braid so off to the Kent Boat Jumble yesterday to see George the rope man, I now have 25 metres of 12mm braid on braid just need to splice an eye in the end and pull it in and as they say the jobs a good un.

Wednesday, 2 March 2016

Started Painting

Started painting today with the engine space bilge using grey garage floor paint from Tool Station according to the 'experts' on the YBW forum its as good as the proper stuff but much cheaper time will tell. Gave it a good wash out with Screwfix No Nonsense degreaser and a good wire brushing then another wash with sugar soap.



Before


After

The forward and aft cockpit drains are linked up the green hose but are temporarily led out through the opening for the engine cooling water sea cock the cockpit drain sea cocks require new skin fittings and when the weather is a bit warmer I will epoxy in the backing pads.
I have started putting some of the original woodwork back into the saloon to get a feel for how I intend to progress in this area. The previous owner had made up some new panels lined with white laminate for the fore cabin which I will use but I am undecided about the saloon at the moment.


Saloon dinette area

My youngest daughter paid a visit on Monday and these photographs with the exception of the painted engine space bilge are her work.
Finally I got the pulpit on today no photograph I am afraid the camera battery gave up the ghost.